Field development plan project

Heriot-Watt Institute of Petroleum Engineering                       PE Design Project Marking Criteria and Scoring Guide (after Couples)
Marks (%)
Performance Areas

70-100

60-69 50-59 40-49 <30  
Geology

(9 marks)

Provides a clear and complete statement of the depositional environment and structure of the reservoir, including those factors that have a significant impact on the remainder of the study

 

Provides an adequate statement of the depositional environment and structure of the reservoir, including some of the factors that have other impacts on the study

 

Provides a just-adequate description of the depositional environment and structure of the reservoir, with little evidence that the wider impacts are understood

 

Provides an inadequate description of the depositional environment and structure of the reservoir, with no evidence that the wider impacts are understood

 

Provides a very inadequate description of the depositional environment and structure of the reservoir

 

Formation Evaluation

(7 marks)

Demonstrates complete competence in making petrophysical interpretations and predictions, and explores the role of uncertainties and the consequences of alternative approaches

 

Demonstrates good competence in making petrophysical interpretations and predictions, and shows evidence of an appreciation of the role of uncertainties or of alternative approaches

 

Demonstrates competence in making petrophysical interpretations and predictions, but shows little evidence of appreciation of the role of uncertainties or of alternative approaches

 

Demonstrates only questionable competence in making petrophysical interpretations and predictions, with no evidence of broader thinking

 

Demonstrates a lack of competence in making petrophysical interpretations and predictions.

 

Reservoir Engineering

(14 marks)

Comprehensive use of well-test data, fluid and rock properties, and simulation to assess dynamic behaviour of reservoir

 

Appropriate use of well-test data, fluid and rock properties, and simulation to assess dynamic behaviour of reservoir

 

Adequate use of well-test data, fluid and rock properties, and simulation to assess dynamic behaviour of reservoir

 

Limited use of well-test data, fluid and rock properties, and simulation to assess dynamic behaviour of reservoir

 

Little use of well-test data, fluid and rock properties, and simulation to assess dynamic behaviour of reservoir

 

Drilling Engineering

(5 marks)

Comprehensive use of engineering data to design mud, cement, hydraulics and drilling system

 

Appropriate use of engineering data to design mud, cement, hydraulics and drilling system

 

Adequate use of engineering data to design mud, cement, hydraulics and drilling system

 

Limited use of engineering data to design mud, cement, hydraulics and drilling system

 

Little use of engineering data to design mud, cement, hydraulics and drilling system

 

 

 

Production Technology

(7 marks)

Comprehensive use of engineering data to design bottomhole, completion string, surface facilities, including control and management of the production/injection

 

Appropriate use of engineering data to design bottomhole, completion string, surface facilities, including control and management of the production/injection

 

Adequate use of engineering data to design bottomhole, completion string, surface facilities, including control and management of the production/injection

 

Limited use of engineering data to design bottomhole, completion string, surface facilities, including control and management of the production/injection.

 

Little use of engineering data to design bottomhole, completion string, surface facilities, including control and management of the production/injection

 

Commercial Analysis

(7 marks)

Demonstrates thorough understanding of the capital and operating costs associated with chosen developments

 

Demonstrates adequate understanding of the capital and operating costs associated with chosen developments

 

Demonstrates some understanding of the capital and operating costs associated with chosen developments

 

Demonstrates limited understanding of the capital and operating costs associated with chosen developments

 

Demonstrates little understanding of the capital and operating costs associated with chosen developments

 

Reservoir & Well Management/Monitoring, i.e. Production Plan

(2 marks)

Demonstrates thorough understanding of analysis of uncertainty related to production scenarios of the reservoir and development of production plan

 

Demonstrates adequate understanding of analysis of uncertainty related to production scenarios of the reservoir and development of production plan

 

Demonstrates some understanding of analysis of uncertainty related to production scenarios of the reservoir and development of production plan

 

Demonstrates limited understanding of analysis of uncertainty related to production scenarios of the reservoir and development of production plan

 

Demonstrates little understanding of analysis of uncertainty related to production scenarios of the reservoir and development of production plan

 

Environmental Impact and Abatement, and Decommissioning

(7 marks)

Demonstrates thorough understanding of environmental factors associated with exploration and production

 

Demonstrates adequate understanding of environmental factors associated with exploration and production

 

Demonstrates some understanding of environmental factors associated with exploration and production

 

Demonstrates limited understanding of environmental factors associated with exploration and production

 

Demonstrates little understanding of environmental factors associated with exploration and production

 

Report Integration and Quality

(13 marks)

Assembling the information in a new way. Rigorous interpretation of data Executive summary, contents, conclusions, and figures well laid out. Right length. Enjoyable and easy to read. Group success evidenced by fully-integrated nature of report.

 

Assembling the information in an efficient but not novel way. Sound interpretation of data. Good layout, good use of figs and captions. Well written. Patchy evidence of group interactions.

 

A reasonable effort at assembling the information. Little interpretation of data or inter-relationships. Good figs and captions, but poor layout. Adequate, but dull, use of English. Little evidence of group interactions and integration.

 

No evidence of thought going into the arrangement of the material. No interpretation of data. Poor layout. Sloppy location of figs. No or sloppy captions. Weak sentence/paragraph construction. No clear evidence of group interactions.

 

Very poorly assembled information. Data wrongly interpreted. No lay out. Wrong length. Very sloppy use of English. Group breakdown indicated by misinformation and inconsistent data.

 

p(20)

Place  your order now to enjoy great discounts on this or a similar topic.

People choose us because we provide:

Essays written from scratch, 100% original,

Delivery within deadlines,

Competitive prices and excellent quality,

24/7 customer support,

Priority on their privacy,

Unlimited free revisions upon request, and

Plagiarism free work,

 

Order Similar Assignment Now!

  • Our Support Staff are online 24/7
  • Our Writers are available 24/7
  • Most Urgent order is delivered within 4 Hrs
  • 100% Original Assignment Plagiarism report can be sent to you upon request.

GET 15 % DISCOUNT TODAY use the discount code PAPER15 at the order form.

Type of paper Academic level Subject area
Number of pages Paper urgency Cost per page:
 Total: